By Categories: Environment

Deepor Beel, a Ramsar site near Guwahati in Assam, known for its fish and bird diversity and rich aquatic vegetation that attracts wild elephants, faces conservation threats from garbage dumping, quarrying, and the construction of a railway line, besides a smart city project.

[wptelegram-join-channel link=”https://t.me/s/upsctree” text=”Join @upsctree on Telegram”]

DEEPOR BEEL, a perennial freshwater lake located 10 km south-west of Guwahati city, is the only wetland in Assam designated as a site of importance for “conservation and sustainable use” under the Ramsar Convention on Wetlands. (The international treaty is named after Ramsar in Iran, where it was signed in 1971.)

The landscape of Deepor Beel, a riverine wetland in Kamrup district in the lower Brahmaputra valley, is dynamic, holding attraction for ornithologists, wildlife biologists and environmentalists. It is also a grooming site for bird enthusiasts as it sustains over 200 species of birds, including about 70 species of migratory birds.

Residents of Guwahati often visit or stop over at Deepor Beel for a breath of fresh air and get immersed in the serenity of the landscape. The lake attracts ecotourists and visitors from the across the world. However, the hard realities of increasing conservation threats to this unique biodiversity site lie hidden beneath the spectacular sights.

It is a treat to see wild Asiatic elephants from the Rani and Garbhanga Reserve Forests in Kamrup East Division bathing and feeding on nutritious aquatic food in the wetland. However, there is no guarantee that all the elephants foraging and frolicking in the water will return safely to the four elephant corridors crossing the railway track. For that matter, even their passage to the beel (lake) from the hills for a feast of the water hyacinth and shoots, rhizomes and flowers of the giant water lily, commonly known as makhana (Eueyale ferox), and other aquatic vegetation is fraught with danger.

Incidents of elephants getting run over or hit by speeding trains on the railway line running through the reserve forests and the Deepor Beel Wildlife Sanctuary in the section between Azara and Kamakhya railway stations are grim reminders of how environmental activists’ warnings against construction of railway lines through the wetland went unheeded. In the past two decades, at least 15 wild elephants were hit by passing trains while crossing the railway track.

About 50 fish species and aquatic resources provide livelihood support to about 1,200 households residing in about 12 villages on the fringes of the wetland. Some residents of these villages can be seen rowing their flat-bottomed boats to collect seeds of the giant water lily and nymphaea nuts that are in high demand in local markets.

Unregulated and increasing fishing activities have come into conflict with the activities of migratory birds. The winged visitors use the wetland as a staging site for depositing fats by preying on the fish species.

Birdlife international declared Deepor Beel as an Important Bird Area (IBA) site. Some of the unique migratory bird species that can be spotted here are the white-eyed pochard, the greylag goose, Baer’s pochard and the gadwall, a dabbling duck.

The ecosystem

The Deepor Beel, which was notified under the Guwahati Water Bodies (Preservation and Conservation) Act, 2008, is the only major storm water drainage for the ever-expanding capital city. Mora Bharalu, an abandoned 13.5-km-long channel of the river Bharalu, which flows through the city, and the Basistha-Bahini rivers are the inlets that carry rainwater and untreated sewage to Deepor Beel. The city with a population of 12 lakh does not have a sewage treatment plant. The Khandajan outlet situated in the north-eastern section of the beel is connected with the river Brahmaputra.

The Rani and Garbhanga hills, the habitat of the Asiatic elephants in the southern side of the beel, are part of this ecosystem. Some parts of the hill landscape of the wetland are getting denuded owing to stone mining and earth excavation while heaps of unsegregated municipal solid waste from Guwahati are getting dumped in the Boragaon landfill site near the wetland.

The major villages in the catchment areas of the wetland are Chakardeo, Pamohi, Sakardhum Mikir, Matia Pahar, Deochotal, Maghuwapara, Banghara Than, Dharapur Chariali, Gorchuk and Boragaon.

Following a right to information (RTI) petition, the National Green Tribunal (NGT) directed the Assam government to take steps to declare Deepor Beel an eco-sensitive zone in order to address the growing conservation threats to it. The government has submitted the draft notification to the Union Ministry of Environment, Forest and Climate Change. The NGT, in its order on December 1, 2020, directed the Ministry to file a status report.

Fragmentation of elephant habitat

In its affidavit to the NGT, the State government stated that the Wildlife Institute of India proposed in 2019—on the basis of a feasibility study conducted by the Delhi Integrated Multi-Modal Transit System Limited for alternative alignment of the railway line in order to avoid the elephant corridor between Azara and Kamakhya stations—that the most suitable alternative would be “realignment/northern alignment of the railway track outside ‘Deepar Beel’ as it will completely avoid the elephant-prone area and also it will not affect the entire ‘Deepor Beel’ and any major habitations”. This was the same suggestion put forward by those who opposed the construction of the railway track running through the wetland decades ago.

The Northeast Frontier Railway authorities are yet to take a decision on the realignment of the track.

Shrinking area

Contradictory positions of the River Rejuvenation Committee (RRC), Assam, and Guwahati Smart City Projects Limited on the total area of Deepor Beel is a reflection of the hard realities of the wetland standing at the crossroads of development priorities and conservation challenges.

“The notified area of the beel is about 6.89 sq. km. Though earlier reports indicate 40 sq. km of beel area, the current total wetland area is about 13 to 15 sq. km,” claims Guwahati Smart City Projects Limited. The Action Plan for Deepor Beel approved by the RRC, on the other hand, states: “Ramsar Convention in 2002 declared 40.14 sq. km as Deepor Beel wetland and 4.14 sq. km area was proposed as a bird sanctuary under the Wildlife Protection Act of India, 1972 (Government of Assam, 1989).

The beel is part of the elephant habitat and contiguous to Rani and Garbhanga reserve forests. Increased presence of human beings on the southern bank of the wetland may lead to stopping of the movement of wild elephants from Rani and Garbhanga reserve forests to Deepor Beel permanently.

The department wrote to the Guwahati Smart City Projects Limited authorities suggesting that the watch tower and a restaurant with a picnic spot should be constructed on the northern bank of the lake as per the Government of India’s Wetlands (Conservation and Management) Rules, 2017.

Conservation threats

An experts’ team constituted by the erstwhile Planning Commission in 2008 to review the status of implementation of the National Wetland Conservation and Management Programme of the Ministry of Environment and Forests identified the following major threats to the Deepor Beel ecosystem: Fragmentation of hydrological regime, siltation, pollution, encroachment and land reclamation, species invasion, including alien species, unregulated recreation and tourism, over-harvesting of resources and climate change.

“Large-scale encroachment, heavy siltation from the denuded hills surrounding the beel, accumulation of all sorts of filth and wastes from the Bharalu and Bahini rivers, unregulated fishing practice, invasion of aquatic weeds, industrial development within its periphery, construction of railway line along the southern boundary, quarrying within the beel ecosystem, etc., have pushed this once-pristine ecosystem to the brink of disappearance,” the report submitted by the expert team stated.

The threats have only increased over the past decade or so. The Action Plan for Deepor Beel approved by the RRC corroborates this. “The total area of the polluted stretch of Deepar Beel is 40.14 sq. km. The area has been suffering from environmental degradation due to continuous encroachment and waste dumping as the Guwahati Municipality dump yard (24 hectares) located in Boragaon, lies in the eastern corner of Deepor Beel.

The encroachment of the beel is very evident and rampant as there are a number of dwelling units and cement structures and hence encroachment and settlements around the periphery has contributed to the shrinking of the beel. The wetland ecosystem is disturbed by the railways’ railroad in the southern boundary and the embankment for the railroad has resulted in the water flow blockage,” states the plan.

The beel has 111 species belonging to free floating, submerged and emergent weeds/plants besides swamp/marsh and wetland hydrophytes while the fauna in the wetland and adjacent forests comprise some 201 species of birds and 21 species of mammals.

Dumping site

Adjutant storks and rag pickers sharing scavenging space at the dumping site at Boragoan and the dumping site posing a threat to the wetland are pixels of an enlarged picture of a flawed model of development that often comes into conflict with environment protection.

Smoke billowing from heaps of unsegregated and untreated solid waste and the stink emanating from the filthy and hazardous waste fail to deter rag pickers as their livelihood compulsion overshadows health hazards.

In response to an application filed by the RTI activist Rohit Choudhury, the Assam government submitted to the NGT on June 23, 2015, through an affidavit that “steps have been initiated to shift the municipal dumping site away from West Boragaon”. More than five years and eight months have elapsed since then, but heaps of garbage have only grown bigger as the municipal waste of Guwahati city continues to be dumped there.

The government submitted to the NGT that the dumping site would be shifted once the four proposed decentralised solid waste management facilities in the city commenced and gave December 31, 2019, as the tentative date for discontinuation of dumping at the Boragoan landfill site.

“This wetland is not only known for its fish and bird diversity but is a major natural water reservoir for Guwahati city and its adjoining areas. Its conservation is crucial to avoid an ecological catastrophe in the area, which could affect local livelihood.

Unplanned urbanisation

However, in the past two decades, unplanned urbanisation around Deepor Beel has reduced the original water spread area, which is a cause of worry. If the existing landscape of Deepor Beel is further altered, it could trigger flash floods in the area.

The experts’ team sounded the alarm bell in its report: “Deepor is the best indicator of the environmental quality of the city, and the day the birds cease to flock the beel, it will confirm the complete transformation of the once green city into a quagmire of pollution.”

Inordinate delay in preventing garbage dumping at the site, demarcation of the wetland’s boundary, notification of the eco-sensitive zone and implementation of an integrated management plan is pushing DeeporBeel to the brink. The growth of commercial, institutional and residential activities in the wetland landscape has sought to amplify the fears expressed by environmental experts 12 years ago.


 

Share is Caring, Choose Your Platform!

Recent Posts


    In a diverse country like India, where each State is socially, culturally, economically, and politically distinct, measuring Governance becomes increasingly tricky. The Public Affairs Index (PAI 2021) is a scientifically rigorous, data-based framework that measures the quality of governance at the Sub-national level and ranks the States and Union Territories (UTs) of India on a Composite Index (CI).


    States are classified into two categories – Large and Small – using population as the criteria.

    In PAI 2021, PAC defined three significant pillars that embody GovernanceGrowth, Equity, and Sustainability. Each of the three Pillars is circumscribed by five governance praxis Themes.

    The themes include – Voice and Accountability, Government Effectiveness, Rule of Law, Regulatory Quality and Control of Corruption.

    At the bottom of the pyramid, 43 component indicators are mapped to 14 Sustainable Development Goals (SDGs) that are relevant to the States and UTs.

    This forms the foundation of the conceptual framework of PAI 2021. The choice of the 43 indicators that go into the calculation of the CI were dictated by the objective of uncovering the complexity and multidimensional character of development governance

    The Equity Principle

    The Equity Pillar of the PAI 2021 Index analyses the inclusiveness impact at the Sub-national level in the country; inclusiveness in terms of the welfare of a society that depends primarily on establishing that all people feel that they have a say in the governance and are not excluded from the mainstream policy framework.

    This requires all individuals and communities, but particularly the most vulnerable, to have an opportunity to improve or maintain their wellbeing. This chapter of PAI 2021 reflects the performance of States and UTs during the pandemic and questions the governance infrastructure in the country, analysing the effectiveness of schemes and the general livelihood of the people in terms of Equity.

    Growth and its Discontents

    Growth in its multidimensional form encompasses the essence of access to and the availability and optimal utilisation of resources. By resources, PAI 2021 refer to human resources, infrastructure and the budgetary allocations. Capacity building of an economy cannot take place if all the key players of growth do not drive development. The multiplier effects of better health care, improved educational outcomes, increased capital accumulation and lower unemployment levels contribute magnificently in the growth and development of the States.

    The Pursuit Of Sustainability

    The Sustainability Pillar analyses the access to and usage of resources that has an impact on environment, economy and humankind. The Pillar subsumes two themes and uses seven indicators to measure the effectiveness of government efforts with regards to Sustainability.

     

    The Curious Case Of The Delta

    The Delta Analysis presents the results on the State performance on year-on-year improvement. The rankings are measured as the Delta value over the last five to 10 years of data available for 12 Key Development Indicators (KDI). In PAI 2021, 12 indicators across the three Pillars of Equity (five indicators), Growth (five indicators) and Sustainability (two indicators). These KDIs are the outcome indicators crucial to assess Human Development. The Performance in the Delta Analysis is then compared to the Overall PAI 2021 Index.

    Key Findings:-

    1. In the Large States category (overall), Chhattisgarh ranks 1st, followed by Odisha and Telangana, whereas, towards the bottom are Maharashtra at 16th, Assam at 17th and Gujarat at 18th. Gujarat is one State that has seen startling performance ranking 5th in the PAI 2021 Index outperforming traditionally good performing States like Andhra Pradesh and Karnataka, but ranks last in terms of Delta
    2. In the Small States category (overall), Nagaland tops, followed by Mizoram and Tripura. Towards the tail end of the overall Delta ranking is Uttarakhand (9th), Arunachal Pradesh (10th) and Meghalaya (11th). Nagaland despite being a poor performer in the PAI 2021 Index has come out to be the top performer in Delta, similarly, Mizoram’s performance in Delta is also reflected in it’s ranking in the PAI 2021 Index
    3. In terms of Equity, in the Large States category, Chhattisgarh has the best Delta rate on Equity indicators, this is also reflected in the performance of Chhattisgarh in the Equity Pillar where it ranks 4th. Following Chhattisgarh is Odisha ranking 2nd in Delta-Equity ranking, but ranks 17th in the Equity Pillar of PAI 2021. Telangana ranks 3rd in Delta-Equity ranking even though it is not a top performer in this Pillar in the overall PAI 2021 Index. Jharkhand (16th), Uttar Pradesh (17th) and Assam (18th) rank at the bottom with Uttar Pradesh’s performance in line with the PAI 2021 Index
    4. Odisha and Nagaland have shown the best year-on-year improvement under 12 Key Development indicators.

    In the Scheme of Things

    The Scheme Analysis adds an additional dimension to ranking of the States on their governance. It attempts to complement the Governance Model by trying to understand the developmental activities undertaken by State Governments in the form of schemes. It also tries to understand whether better performance of States in schemes reflect in better governance.

    The Centrally Sponsored schemes that were analysed are National Health Mission (NHM), Umbrella Integrated Child Development Services scheme (ICDS), Mahatma Gandh National Rural Employment Guarantee Scheme (MGNREGS), Samagra Shiksha Abhiyan (SmSA) and MidDay Meal Scheme (MDMS).

    National Health Mission (NHM)

    • In the 60:40 division States, the top three performers are Kerala, Goa and Tamil Nadu and, the bottom three performers are Uttar Pradesh, Jharkhand and Bihar.
    • In the 90:10 division States, the top three performers were Himachal Pradesh, Sikkim and Mizoram; and, the bottom three performers are Manipur, Assam and Meghalaya.

     

    INTEGRATED CHILD DEVELOPMENT SERVICES (ICDS)

    • Among the 60:40 division States, Orissa, Chhattisgarh and Madhya Pradesh are the top three performers and Tamil Nadu, Telangana and Delhi appear as the bottom three performers.
    • Among the 90:10 division States, the top three performers are Manipur, Arunachal Pradesh and Nagaland; and, the bottom three performers are Jammu and Kashmir, Uttarakhand and Himachal Pradesh

     

    MID- DAY MEAL SCHEME (MDMS)

    • Among the 60:40 division States, Goa, West Bengal and Delhi appear as the top three performers and Andhra Pradesh, Telangana and Bihar appear as the bottom three performers.
    • Among the 90:10 division States, Mizoram, Himachal Pradesh and Tripura were the top three performers and Jammu & Kashmir, Nagaland and Arunachal Pradesh were the bottom three performers

     

    SAMAGRA SHIKSHA ABHIYAN (SMSA)

    • West Bengal, Bihar and Tamil Nadu were the top three States amongst the 60:40 division States; while Haryana, Punjab and Rajasthan appeared as the bottom three performers
    • In the case of 90:10 division States, Mizoram, Assam and Tripura were the top three performers and Nagaland, Jammu & Kashmir and Uttarakhand featured as the bottom three

     

    MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE SCHEME (MGNREGS)

    • Among the 60:40 division States, the top three performers are Kerala, Andhra Pradesh and Orissa and the bottom three performers are Madhya Pradesh, Jharkhand and Goa
    • In the 90:10 division States, the top three performers are Mizoram, Sikkim and Nagaland and the bottom three performers are Manipur and Assam